Work Problems Involving Men, Women and Children Working Together at Different Rates
Quantitative Aptitude › Time and Work, Pipes and Cisterns · Topic 9.11
Work problems with men, women and children use one common unit of efficiency. If one man does the work of two women, convert everyone into women (or men), find the total work in that unit, and then divide by the new group's strength.
6 min read · Quantitative Aptitude · Time and Work, Pipes and Cisterns
Quick Answer
Work problems with men, women and children use one common unit of efficiency. If one man does the work of two women, convert everyone into women (or men), find the total work in that unit, and then divide by the new group’s strength.
At a Glance
- First step Fix a common efficiency unit
- Example equivalence 1 man = 2 women
- Total work Workers × days (in units)
- New time Total work / new strength
- Alone data Rates 1/a + 1/b + 1/c add up
- Check Units must match on both sides
Where Does It Fit?
This topic finishes the work group by extending Work Sharing and Wage Distribution Based on Efficiency Ratio to workers of different kinds. It uses the man-day idea from Man-Days-Hours Work Equivalence Problems and the group logic of Combined Work by Multiple Persons or Groups.
How Do You Handle Workers of Different Efficiency?
In short: express every worker in one common unit. If one man equals two women, a group of 4 men and 6 women is equal to 8 + 6 = 14 women.
Method
- Step 1: write the equivalence, such as 1 man = 2 women = 4 children
- Step 2: convert each group into a single type of worker
- Step 3: total work = equivalent workers × days
- Step 4: new days = total work / new equivalent workers
If 4 men and 6 women finish a job in 5 days when 1 man equals 2 women, the total work is 5 × 14 = 70 woman-days. A team of 3 men and 4 women equals 10 women and takes 70 / 10 = 7 days.
How Do You Use Efficiency Units for Men, Women and Children?
| Worker | Units per day | Group | Units per day |
|---|---|---|---|
| Man | 3 | 5 men | 15 |
| Woman | 2 | 6 women | 12 |
| Child | 1 | 6 children | 6 |
| All together | – | 5 men + 6 women + 6 children | 33 |
If this team finishes a job in 4 days, the work is 33 × 4 = 132 units. Eight men alone supply 24 units a day, so they would need 132 / 24 = 5.5 days. The unit idea is the same as the man-day method in Man-Days-Hours Work Equivalence Problems.
How Do You Use Alone Times to Find Individual Efficiency?
- Alone times given: a man, a woman and a boy who take 6, 8 and 12 days alone work at 1/6, 1/8 and 1/12 per day, so together they take 1 / (1/6 + 1/8 + 1/12) = 8/3 days.
- Subtract to find one group: if 4 men and 4 women take 6 days and 4 men alone take 10 days, then 4 women do 1/6 – 1/10 = 1/15 a day, so 1 woman takes 60 days alone.
- Ratio of efficiency: in that case one man does 1/40 a day and one woman 1/60, so man : woman = 3 : 2.
- Link to wages: the same ratio decides how pay is split, as in Work Sharing and Wage Distribution Based on Efficiency Ratio.
Solved Examples
Example 1
Question: 4 men and 6 women finish a job in 5 days. If one man does the work of 2 women, how long will 3 men and 4 women take?
- Convert to women: 4 men = 8 women, so the first team = 14 women.
- Total work = 14 × 5 = 70 woman-days.
- New team = 6 + 4 = 10 women, so days = 70 / 10 = 7.
Answer: 7 days
Example 2
Question: A man, a woman and a child do 3, 2 and 1 units of work per day. 5 men, 6 women and 6 children finish a job in 4 days. How long will 8 men alone take?
- Units per day = 15 + 12 + 6 = 33.
- Total work = 33 × 4 = 132 units.
- 8 men do 24 units a day, so days = 132 / 24 = 5.5.
Answer: 5.5 days
Example 3
Question: 12 women can finish a job in 10 days. One man equals 2 women. How long will 15 men take?
- 12 women = 6 men, so 6 men take 10 days.
- Total work = 6 × 10 = 60 man-days.
- Days for 15 men = 60 / 15 = 4.
Answer: 4 days
Example 4
Question: 4 men and 4 women can do a job in 6 days, and 4 men alone can do it in 10 days. How long does 1 woman take alone?
- 4 men and 4 women do 1/6 a day; 4 men do 1/10 a day.
- 4 women do 1/6 – 1/10 = 1/15 a day.
- 1 woman does 1/60 a day, so she takes 60 days.
Answer: 60 days
Example 5
Question: A man, a woman and a boy take 6, 8 and 12 days alone. How long do they take together?
- Rates are 1/6, 1/8 and 1/12; use 24 as the total work, so 4, 3 and 2 units a day.
- Together = 9 units a day.
- Days = 24 / 9 = 8/3.
Answer: 8/3 days, which is 2 days 16 hours
Shortcuts and Tricks
- Write the equivalence first and convert everything into one type of worker.
- Total work in worker-days stays the same when the team changes.
- If one group’s time is known alone, subtract it from the combined rate to find the other group.
- Use a total work equal to the LCM of the alone days to avoid fractions.
- Check that a more efficient worker takes fewer days.
Common Mistakes
- Counting a man and a woman as equal units when the question gives a different ratio.
- Dividing by the number of people and not the equivalent workers.
- Mixing man-days and woman-days.
- Adding days instead of rates when alone times are given.
- Forgetting to convert the new team into the same unit.
Practice Questions
- One man does the work of 2 women. 3 men and 4 women finish a job in 5 days. How long will 2 men and 2 women take?
- 10 women finish a job in 12 days. One man equals 1.5 women. How long will 8 men take?
- A man, a woman and a child do 3, 2 and 1 units a day. 4 men, 3 women and 2 children take how long for a 200-unit job?
- A man takes 6 days and a woman 12 days alone. How long do they take together?
- One woman equals 2/3 of a man. 6 men finish a job in 10 days. How long will 9 women take?
Answers: 1) 8 1/3 days; 2) 10 days; 3) 10 days; 4) 4 days; 5) 10 days.
Why Is This Topic Important?
- Harder tier Mixed workers appear in the tougher time and work questions.
- Unit thinking It teaches conversion into one unit.
- Real life Teams in practice have workers of unequal pace.
- Wrap-up It completes the time and work group.
What Comes Next?
This is the last topic of the time and work macro. The next macro begins with Speed, Distance and Time Basic Relationship and Unit Conversion (km/h to m/s) and moves from work to motion.
Key Terms and Formulas
- Equivalence A rule such as 1 man = 2 women
- Efficiency unit Common measure of work per day
- Man-day Work done by one man in one day
- Woman-day Work done by one woman in one day
- Total work Equivalent workers multiplied by days
- Combined rate Sum of the rates of all workers
Related Topics
- Pipe-Filling Problems with a Simultaneous Leak
- Work and Efficiency Relationship (Inverse Proportion)
- Combined Work by Multiple Persons or Groups
- Work and Wages Distribution Problems
Exam Corner
Points to Remember
- Convert all workers into one unit using the equivalence.
- Total work = equivalent workers × days.
- New days = total work / new equivalent workers.
- For alone times, add the rates 1/a + 1/b + 1/c.
- Subtract known group rates to find the unknown group’s rate.
Do Not Confuse With
- People vs equivalent workers Divide by equivalent workers, not by head count.
- Man-days vs woman-days Convert before comparing.
- Alone time vs group time Alone times give rates; group times give combined rates.
- Rate vs time Rate is the reciprocal of time.
Memory Hook
Convert to one worker type, find the total work, then divide.
GS Relevance
Frequently Asked Questions
How do you solve work problems with men and women?
To solve work problems with men and women, express both in a common efficiency unit using the given equivalence, such as one man equals two women. Convert each team into that unit, find the total work as equivalent workers times days, and divide by the new team's equivalent workers.
If one man equals two women, how many women are 4 men and 6 women?
If one man equals two women, 4 men equal 8 women, so 4 men and 6 women together equal 14 women. When this team finishes a job in 5 days, the total work is 70 woman-days, which is the basis for finding the time of any other team.
How do you find a woman's time when men's time is known?
To find a woman's time, subtract the men's rate from the combined rate. If 4 men and 4 women take 6 days and 4 men take 10 days, the women's rate is one sixth minus one tenth, which is one fifteenth, so one woman takes 60 days alone.
How are children included in work problems?
Children are included by giving them a smaller efficiency unit. If a man does 3 units a day, a woman 2 units and a child 1 unit, then 5 men, 6 women and 6 children do 15 plus 12 plus 6, which is 33 units a day.
What is the check for mixed-group work answers?
The check for a mixed-group work answer is that total work stays the same in worker-days. Multiply the equivalent workers by days for the first team and for the second team, and confirm that the two products are equal before trusting the answer.
PYQ Practice — Statement Analysis
1 If one man equals two women, 4 men and 6 women equal 14 women.
4 men = 8 women, and 8 + 6 = 14.
2 12 women take 10 days, so 6 men also take 10 days if one man equals two women.
12 women = 6 men.
3 When 4 men and 4 women take 6 days and 4 men take 10 days, one woman takes 40 days.
4 women do 1/15 a day, so one woman takes 60 days.
4 A man, a woman and a boy taking 6, 8 and 12 days alone finish a job together in 8/3 days.
1 / (1/6 + 1/8 + 1/12) = 8/3.
Related Topics
Browse the full Quantitative Aptitude index