Combined Work by Multiple Persons or Groups
Quantitative Aptitude › Time and Work, Pipes and Cisterns · Topic 9.2
When several workers or groups work together, their daily work rates are added. Together, A and B take ab/(a + b) days, where A takes a days and B takes b days.
5 min read · Quantitative Aptitude · Time and Work, Pipes and Cisterns
Quick Answer
When several workers or groups work together, their daily work rates are added. Together, A and B take ab/(a + b) days, where A takes a days and B takes b days.
At a Glance
- Two workers Time = ab/(a + b)
- Three workers 1/(1/a + 1/b + 1/c)
- Find one worker 1/(1/together – 1/other)
- Daily rates Add rates, not days
- Work done in n days n × combined daily rate
- Pair sums Add all pairs, divide by 2
Where Does It Fit?
This topic builds on Work and Efficiency Relationship (Inverse Proportion). It leads to Work and Wages Distribution Problems on wages and to Work Left/Completed When People Join or Leave Midway on workers who join or leave.
How Do You Find the Time When People Work Together?
In short: add the one-day work of each worker and take the reciprocal.
Combined work
- Together time = 1 / (1/a + 1/b)
- For two workers, this equals ab / (a + b)
- For three workers, together time = 1 / (1/a + 1/b + 1/c)
If A takes 10 days and B takes 15 days, together they take 10 × 15 / 25 = 6 days. For A = 12, B = 15 and C = 20, the one-day work is 1/12 + 1/15 + 1/20 = 12/60 = 1/5, so they finish in 5 days.
How Do You Find One Worker From the Others?
| Given | Method | Result |
|---|---|---|
| A + B = 8 days, A = 12 days | 1/8 – 1/12 = 1/24 | B alone = 24 days |
| A + B = 12, B + C = 15, A + C = 20 | Add: 2(A + B + C) = 1/12 + 1/15 + 1/20 = 1/5 | A + B + C = 1/10, so 10 days |
| A = 1/10 – (B + C) = 1/10 – 1/15 | 1/30 | A alone = 30 days |
The pair-sum trick for three workers saves time: add the three pair rates, halve the sum, and subtract a pair to isolate the third.
What Shortcuts Help in Combined Work?
- LCM units: with total work 60 for 12, 15 and 20 days, rates are 5, 4 and 3, which total 12, so the time is 60 / 12 = 5 days.
- Smaller than the smallest: the combined time is always less than the fastest worker’s time.
- Equal workers: if n equal workers each take d days, together they take d / n days.
- Efficiency link: see Work and Efficiency Relationship (Inverse Proportion) for converting days into rates.
Solved Examples
Example 1
Question: A can finish a work in 10 days and B in 15 days. In how many days will they finish it together?
- One day’s work of A = 1/10 and of B = 1/15.
- Together = 1/10 + 1/15 = 5/30 = 1/6.
- Time = 6 days.
Answer: 6 days
Example 2
Question: A, B and C can finish a work in 12, 15 and 20 days. How long will they take together?
- Total daily work = 1/12 + 1/15 + 1/20 = 5/60 + 4/60 + 3/60 = 12/60.
- 12/60 = 1/5.
- Time = 5 days.
Answer: 5 days
Example 3
Question: A and B together can do a work in 8 days, and A alone in 12 days. How long does B take alone?
- B’s daily work = 1/8 – 1/12.
- 1/8 – 1/12 = 3/24 – 2/24 = 1/24.
- Time for B = 24 days.
Answer: 24 days
Example 4
Question: A and B can do a work in 12 days, B and C in 15 days, and A and C in 20 days. How long will A, B and C take together, and A alone?
- Add the three: 2(A + B + C) = 1/12 + 1/15 + 1/20 = 1/5.
- A + B + C = 1/10, so together they take 10 days.
- A = 1/10 – 1/15 = 1/30, so A alone takes 30 days.
Answer: 10 days together; 30 days for A alone
Example 5
Question: Six equal workers each take 30 days to finish a job. How long will all six take together?
- Equal workers share the job equally.
- Time = 30 / 6 = 5 days.
Answer: 5 days
Shortcuts and Tricks
- Add rates (reciprocals of days), never days.
- For two workers, use ab/(a + b) directly.
- With three pair-sums, halve the total to get all three together.
- Use the LCM method to keep the rates as whole numbers.
- The combined time must be smaller than the fastest single time.
Common Mistakes
- Adding the days to get the combined time.
- Forgetting to take the reciprocal at the end.
- Taking the average of the days as the combined time.
- Using the pair-sum total without halving it.
- Combining workers with different job sizes.
Practice Questions
- A takes 20 days and B takes 30 days. How long together?
- A takes 6 days and B takes 12 days. How long together?
- A and B together take 8 days, A alone takes 12 days. How long does B take alone?
- A takes 12 days and B takes 24 days. How long together?
- A, B and C take 6, 9 and 18 days. How long together?
Answers: 1) 12 days; 2) 4 days; 3) 24 days; 4) 8 days; 5) 3 days.
Why Is This Topic Important?
- Most tested Combined work is the core of the chapter.
- Method Adding rates trains rate thinking.
- Speed The pair-sum trick saves time.
- Link It supports Pipes Working Together, Alternately or with One Acting as an Outlet on pipes.
What Comes Next?
The next topic is Work and Wages Distribution Problems, which shares wages in proportion to the work done.
Key Terms and Formulas
- Combined rate Sum of individual daily rates
- Reciprocal One divided by a number
- Pair rate Rate of two workers together
- Equal workers Workers with the same rate
- Alone time Days one worker takes by himself
- Together time Days a team takes
Related Topics
- Work and Efficiency Relationship (Inverse Proportion)
- Work and Wages Distribution Problems
- Work Left/Completed When People Join or Leave Midway
- Pipes and Cisterns – Filling and Emptying Problems
Exam Corner
Points to Remember
- Add rates, not days.
- Together time for two = ab/(a + b).
- Pair sums: halve the total to get all three.
- Combined time is less than the fastest worker’s time.
- n equal workers take d/n days.
Do Not Confuse With
- Rate vs days Add rates; do not add days.
- Together time vs average time Together is shorter than any single time.
- Pair sum vs total Pair sums count each worker twice.
- Alone vs together Alone is longer.
Memory Hook
Add the day’s work, flip it to get the days.
GS Relevance
Frequently Asked Questions
How do you find the time when two persons work together?
When two persons work together, their one-day work rates are added and the reciprocal gives the time. If A takes a days and B takes b days, the time together is ab divided by (a plus b). For A taking 10 days and B taking 15 days, the time together is 6 days.
How do you find the time for three workers together?
For three workers, add the three one-day work rates and take the reciprocal. If A, B and C take 12, 15 and 20 days, the sum of rates is 1/12 plus 1/15 plus 1/20, which equals 1/5, so the three together finish in 5 days.
How do you find a worker's time from the combined time?
A worker's time is found by subtracting the other worker's rate from the combined rate and taking the reciprocal. If A and B take 8 days together and A takes 12 days alone, B's rate is 1/8 minus 1/12, which is 1/24, so B takes 24 days alone.
What is the pair-sum trick for three workers?
The pair-sum trick adds the daily rates of A and B, B and C, and A and C, which counts each worker twice. Dividing the total by 2 gives the rate of all three together, and subtracting a pair's rate from it isolates the third worker's rate.
Why is the combined time less than each individual time?
The combined time is always less than the time of the fastest single worker because adding workers increases the total daily work. With more work done each day, the same job is finished earlier, so together times such as 6 days are shorter than both 10 days and 15 days.
PYQ Practice — Statement Analysis
1 If A takes 10 days and B takes 15 days, they take 25 days together.
Rates are added; they take 6 days together.
2 Two workers taking a and b days take ab/(a + b) days together.
One day's work is 1/a + 1/b = (a + b)/ab.
3 The combined time of a team is shorter than the time of its fastest member.
Adding workers increases the daily work.
4 If A, B and C take 12, 15 and 20 days, they take 5 days together.
1/12 + 1/15 + 1/20 = 1/5.
Related Topics
Browse the full Quantitative Aptitude index