79 RAS Prelims MCQs on energy infrastructure in Rajasthan cover renewable energy, power distribution and the financial health of DISCOMs. The Solar Energy Policy 2019, wind parks, the Green Energy Corridor, UDAY, RDSS, smart meters, AT&C losses and green hydrogen are asked as facts, causes and effects.

Practice questions based on the RPSC RAS Prelims syllabus. They follow the exam pattern but are not past-paper questions.

Clear filters

Showing 31–40 of 79 questions

RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q31. Consider the following statements regarding wind energy in Rajasthan:
I. Rajasthan ranks first in India in terms of installed wind power capacity.
II. The Wind and Hybrid Energy Policy was launched in 2019.
III. Jaisalmer is often referred to as the ‘Wind Energy Capital’ of the state.
IV. Private sector players like Suzlon have played a major role in establishing wind farms in the state.
V. Wind energy generation is entirely consistent throughout the year without seasonal variations.
Which of the above statement(s) is/are incorrect?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q32. The following question consists of two statements--Assertion (A) and Reason (R). Answer the question by selecting the appropriate option.
Assertion (A): The Government of Rajasthan heavily promotes Wind-Solar Hybrid projects.
Reason (R): Combining wind and solar generation at the same location optimizes land use and balances grid supply, since solar peaks during the day and wind often peaks at evening/ night.
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q33. Identify the correct pair representing a prominent wind energy park and its respective district in Rajasthan:
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q34. What is the predominant agricultural residue used as a raw material for biomass power generation plants in Rajasthan?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q35. Consider the following statements regarding biomass energy initiatives in Rajasthan:
I. Biomass power projects provide an additional source of income to farmers through the sale of agro-waste.
II. Biomass plants face operational challenges due to supply chain inconsistencies and seasonal availability of crop residues.
III. Biomass energy is strictly classified as a non-renewable energy source under state policy.
Which of the above statement(s) is/are correct?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q36. Match List-I with List-II and select the correct answer:
Biomass Power ProjectsDistricts
A. Padampur Biomass Planti. Tonk
B. Rangpur Biomass Plantii. Kota
C. Khatoli Biomass Plantiii. Chittorgarh
D. Chanderiya Biomass Plantiv. Sri Ganganagar
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q37. In the context of rural energy initiatives in Rajasthan, what is the primary objective of promoting biogas plants?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q38. Find the odd one out among the sources of fuel generally utilized for biomass energy generation in Rajasthan:
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q39. The Rajasthan Renewable Energy Corporation Limited (RRECL) was formed by the merger of which of the following two entities?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q40. Select the correct sequential evolution of power sector institutions in Rajasthan:

Answer key for these questions

QCorrect answer
31(d) I and V only
32(a) Both A and R are true and R is the correct explanation of A.
33(c) Soda Bandhan - Jaisalmer
34(d) Mustard husk (Juli flora)
35(a) I and II only
36(b) A-iv, B-ii, C-i, D-iii
37(b) To convert organic waste into clean cooking fuel and manure for households.
38(a) Lignite coal
39(c) Rajasthan Energy Development Agency (REDA) and Rajasthan State Power Corporation Ltd (RSPCL)
40(c) Formation of REDA Unbundling of RSEB Formation of RRECL

Key facts from Energy Infrastructure in Rajasthan

  • Under the Rajasthan Solar Energy Policy 2019, the 30 GW target gave 24 GW to utility-scale solar parks.
  • Soda Bandhan is a wind energy park in Jaisalmer.
  • The Green Energy Corridor of RVPNL evacuates solar and wind power to the national grid.
  • AT&C losses means Aggregate Technical and Commercial losses; theft, unmetered connections and poor collection cause them.
  • UDAY brought a debt takeover for DISCOMs; RDSS funds smart metering and infrastructure upgrades; PM-KUSUM solarises agricultural pumps and Saubhagya electrified households.
  • Pre-paid smart meters give upfront revenue collection; Rajasthan can be a green hydrogen hub because of its cheap renewable power.

Frequently asked questions

How many RAS Prelims practice MCQs are there on Energy Infrastructure in Rajasthan?

This page has 79 practice MCQs on Energy Infrastructure in Rajasthan (Rajasthan Economy). Each has the correct answer, and most have an explanation.

What does AT&C loss mean?

Aggregate Technical and Commercial losses, which combine the energy lost in transmission and distribution with the revenue lost through theft, billing errors and poor collection. It is the main measure of a DISCOM’s efficiency.

Which scheme is used to install smart meters in Rajasthan?

The Revamped Distribution Sector Scheme (RDSS). It supports smart metering and distribution upgrades to reduce AT&C losses, and pre-paid smart meters help DISCOMs get their revenue upfront, which improves their cash flow.

What is the solar capacity target of the 2019 policy?

30 GW, of which 24 GW is allotted to utility or grid-scale solar parks. The rest is meant for rooftop, decentralised projects and solar pumps, which together are a much smaller part of the target.