Practice

Energy Infrastructure in Rajasthan: RAS Prelims MCQs

79 RAS Prelims MCQs on energy infrastructure in Rajasthan cover renewable energy, power distribution and the financial health of DISCOMs. The Solar Energy Policy 2019, wind parks, the Green Energy Corridor, UDAY, RDSS, smart meters, AT&C losses and green hydrogen are asked as facts, causes and effects.

Practice questions based on the RPSC RAS Prelims syllabus. They follow the exam pattern but are not past-paper questions.

Clear filters

Showing 1–10 of 79 questions

RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q1. Which of the following statements most accurately reflects the general overview of the installed power capacity in Rajasthan as of recent assessments?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q2. Consider the following statements regarding the energy scenario in Rajasthan:
I. Rajasthan has the highest installed capacity of solar power among all Indian states.
II. The state is a net importer of electricity during peak daytime hours due to low generation.
III. Thermal power continues to play a critical role in providing base-load grid stability.
Which of the above combination of statements is correct?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q3. In the context of Rajasthan’s power sector, what is the primary function of the Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL)?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q4. The following question consists of two statements--Assertion (A) and Reason (R). Answer the question by selecting the appropriate option.
Assertion (A): The share of renewable energy in Rajasthan’s total installed capacity has seen exponential growth in the last decade.
Reason (R): The topographical and climatic conditions of western Rajasthan, characterized by high solar insolation and barren land availability, highly favor large-scale solar project installations.
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q5. Consider the following statements regarding the Suratgarh Super Thermal Power Station:
I. It is located in the Sri Ganganagar district.
II. It operates solely on natural gas.
III. It receives its water supply from the Indira Gandhi Canal.
IV. It is operated by the Rajasthan Rajya Vidyut Utpadan Nigam Ltd (RVUNL).
V. It has both subcritical and supercritical generation units.
Which of the above statement(s) is/are correct?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q6. Identify the exception. All of the following are major coal or lignite-based thermal power projects in Rajasthan, except:
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q7. The Kota Super Thermal Power Station draws its cooling water requirements primarily from which of the following sources?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q8. Match List-I with List-II and select the correct answer:
Nuclear Reactor Types/ProjectsCharacteristics/Locations
A. RAPS Units 1 & 2i. Heavy Water
B. RAPS Units 7 & 8ii. Natural Uranium
C. Fuel used in RAPSiii. Older generation capacity models (100-200 MW)
D. Moderator used in RAPSiv. Indigenous 700 MW Pressurized Heavy Water Reactors
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q9. The Rajasthan Atomic Power Station (RAPS) at Rawatbhata operates on which of the following reactor technologies?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q10. The following question consists of two statements--Assertion (A) and Reason (R). Answer the question by selecting the appropriate option.
Assertion (A): The Rajasthan Atomic Power Station (RAPS) is strategically located at Rawatbhata in the Chittorgarh district.
Reason (R): The availability of abundant water from the Rana Pratap Sagar Dam on the Chambal River is essential for the cooling requirements of the nuclear reactors.

Answer key for these questions

QCorrect answer
1(b) Renewables like solar and wind now exceed thermal power in the state’s total installed capacity.
2(a) I and III only
3(c) To develop and operate all state-owned power generation facilities and plants.
4(a) Both A and R are true and R is the correct explanation of A.
5(c) I, III, IV and V
6(d) Ramgarh Gas Thermal Power Station
7(a) Chambal River via Kota Barrage
8(b) A-iii, B-iv, C-ii, D-i
9(b) Pressurized Heavy Water Reactor (PHWR)
10(a) Both A and R are true and R is the correct explanation of A.

Key facts from Energy Infrastructure in Rajasthan

  • Under the Rajasthan Solar Energy Policy 2019, the 30 GW target gave 24 GW to utility-scale solar parks.
  • Soda Bandhan is a wind energy park in Jaisalmer.
  • The Green Energy Corridor of RVPNL evacuates solar and wind power to the national grid.
  • AT&C losses means Aggregate Technical and Commercial losses; theft, unmetered connections and poor collection cause them.
  • UDAY brought a debt takeover for DISCOMs; RDSS funds smart metering and infrastructure upgrades; PM-KUSUM solarises agricultural pumps and Saubhagya electrified households.
  • Pre-paid smart meters give upfront revenue collection; Rajasthan can be a green hydrogen hub because of its cheap renewable power.

Frequently asked questions

How many RAS Prelims practice MCQs are there on Energy Infrastructure in Rajasthan?

This page has 79 practice MCQs on Energy Infrastructure in Rajasthan (Rajasthan Economy). Each has the correct answer, and most have an explanation.

What does AT&C loss mean?

Aggregate Technical and Commercial losses, which combine the energy lost in transmission and distribution with the revenue lost through theft, billing errors and poor collection. It is the main measure of a DISCOM’s efficiency.

Which scheme is used to install smart meters in Rajasthan?

The Revamped Distribution Sector Scheme (RDSS). It supports smart metering and distribution upgrades to reduce AT&C losses, and pre-paid smart meters help DISCOMs get their revenue upfront, which improves their cash flow.

What is the solar capacity target of the 2019 policy?

30 GW, of which 24 GW is allotted to utility or grid-scale solar parks. The rest is meant for rooftop, decentralised projects and solar pumps, which together are a much smaller part of the target.