Practice

Energy Infrastructure in Rajasthan: RAS Prelims MCQs

79 RAS Prelims MCQs on energy infrastructure in Rajasthan cover renewable energy, power distribution and the financial health of DISCOMs. The Solar Energy Policy 2019, wind parks, the Green Energy Corridor, UDAY, RDSS, smart meters, AT&C losses and green hydrogen are asked as facts, causes and effects.

Practice questions based on the RPSC RAS Prelims syllabus. They follow the exam pattern but are not past-paper questions.

Clear filters

Showing 21–30 of 79 questions

RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q21. What is the most appropriate reason for Rajasthan possessing the highest solar radiation potential in India?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q22. The average solar insolation in Rajasthan is approximately in which of the following ranges?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q23. Consider the following statements regarding the conditions in western Rajasthan for solar power:
I. The region provides large expanses of flat, undeveloped land at low costs.
II. The region has a highly dense population which provides immediate local consumption for large utility-scale plants.
III. The region experiences frequent sandstorms which can temporarily reduce solar panel efficiency and require cleaning mechanisms.
Which of the above statement(s) is/are correct?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q24. Identify the incorrect statement regarding Rajasthan’s solar potential:
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q25. Arrange the developmental phases of the Bhadla Solar Park in the correct order of their implementation:
I. Bhadla Phase-III (1000 MW)
II. Bhadla Phase-I (65 MW)
III. Bhadla Phase-IV (500 MW)
IV. Bhadla Phase-II (680 MW)
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q26. What is the approximate total installed capacity of the Bhadla Solar Park, making it the world’s largest solar park?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q27. Match List-I with List-II and select the correct answer:
Bhadla Solar Park PhasesDeveloping Agencies/Joint Ventures
A. Phase IIi. Saurya Urja Company of Rajasthan Ltd (Joint venture with IL&FS)
B. Phase IIIii. Rajasthan Solar Park Development Company Ltd (RSDCL)
C. Phase IViii. Adani Renewable Energy Park Rajasthan Ltd
D. Nodal Agency for overall facilitationiv. Rajasthan Renewable Energy Corporation (RREC)
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q28. Consider the following statements regarding the Bhadla Solar Park:
I. It is located in the Phalodi district of Rajasthan.
II. It is spread over a total area of approximately 14,000 acres.
III. The park was developed in a single, unified phase by a central government agency.
IV. It has achieved some of the lowest solar power tariffs in India through competitive bidding.
Which of the above statement(s) is/are correct?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q29. Where was Rajasthan’s first wind power project established?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q30. What is the primary cause for the concentration of major wind farms in the Jaisalmer and Barmer districts?

Answer key for these questions

QCorrect answer
21(a) Proximity to the Thar Desert and optimal positioning near the Tropic of Cancer.
22(c) 5.5 - 6.5 kWh/m2/day
23(a) I and III only
24(c) Rajasthan’s solar policy only permits state- owned public sector units to establish solar generation plants.
25(a) II, IV, I, III
26(b) 2,245 MW
27(b) A-ii, B-i, C-iii, D-iv
28(a) I, II and IV
29(c) Amarsagar (Jaisalmer)
30(a) High-velocity wind corridors unhindered by dense forests or high mountains.

Key facts from Energy Infrastructure in Rajasthan

  • Under the Rajasthan Solar Energy Policy 2019, the 30 GW target gave 24 GW to utility-scale solar parks.
  • Soda Bandhan is a wind energy park in Jaisalmer.
  • The Green Energy Corridor of RVPNL evacuates solar and wind power to the national grid.
  • AT&C losses means Aggregate Technical and Commercial losses; theft, unmetered connections and poor collection cause them.
  • UDAY brought a debt takeover for DISCOMs; RDSS funds smart metering and infrastructure upgrades; PM-KUSUM solarises agricultural pumps and Saubhagya electrified households.
  • Pre-paid smart meters give upfront revenue collection; Rajasthan can be a green hydrogen hub because of its cheap renewable power.

Frequently asked questions

How many RAS Prelims practice MCQs are there on Energy Infrastructure in Rajasthan?

This page has 79 practice MCQs on Energy Infrastructure in Rajasthan (Rajasthan Economy). Each has the correct answer, and most have an explanation.

What does AT&C loss mean?

Aggregate Technical and Commercial losses, which combine the energy lost in transmission and distribution with the revenue lost through theft, billing errors and poor collection. It is the main measure of a DISCOM’s efficiency.

Which scheme is used to install smart meters in Rajasthan?

The Revamped Distribution Sector Scheme (RDSS). It supports smart metering and distribution upgrades to reduce AT&C losses, and pre-paid smart meters help DISCOMs get their revenue upfront, which improves their cash flow.

What is the solar capacity target of the 2019 policy?

30 GW, of which 24 GW is allotted to utility or grid-scale solar parks. The rest is meant for rooftop, decentralised projects and solar pumps, which together are a much smaller part of the target.