79 RAS Prelims MCQs on energy infrastructure in Rajasthan cover renewable energy, power distribution and the financial health of DISCOMs. The Solar Energy Policy 2019, wind parks, the Green Energy Corridor, UDAY, RDSS, smart meters, AT&C losses and green hydrogen are asked as facts, causes and effects.

Practice questions based on the RPSC RAS Prelims syllabus. They follow the exam pattern but are not past-paper questions.

Clear filters

Showing 11–20 of 79 questions

RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q11. What is the individual capacity of the newly developed Units 7 and 8 at the Rajasthan Atomic Power Project (RAPP) in Rawatbhata?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q12. Which of the following is a correct pair regarding joint hydroelectric projects and Rajasthan’s share in them?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q13. What is the primary cause for the limited domestic hydropower generation potential within the state boundaries of Rajasthan?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q14. Match List-I with List-II and select the correct answer:
Hydroelectric ProjectsPartner States of Rajasthan
A. Bhakra Nangali. Madhya Pradesh
B. Chambal Valleyii. Gujarat
C. Mahi Bajaj Sagariii. Punjab and Haryana
D. Beas Projectiv. Punjab and Himachal Pradesh (historically shared benefits)
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q15. Consider the following statements regarding the Mahi Bajaj Sagar hydroelectric project:
I. It is situated on the Mahi River in the Banswara district.
II. The power generated from this project is shared equally between Rajasthan and Gujarat.
III. 100% of the hydroelectricity generated is utilized by Rajasthan.
IV. It was primarily designed to benefit the tribal belts of southern Rajasthan.
Which of the above statement(s) is/are correct?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q16. Rajasthan receives a fixed percentage share of power from the Bhakra Nangal joint hydroelectric project. Approximately what is Rajasthan’s share in this project?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q17. The following question consists of two statements--Assertion (A) and Reason (R). Answer the question by selecting the appropriate option.
Assertion (A): Rajasthan is considered the most favorable state in India for the development of solar energy.
Reason (R): Rajasthan receives the highest solar radiation in the country, averaging 300-330 clear sunny days a year, coupled with vast tracts of uncultivable wasteland.
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q18. Choose the correct sequence of states in descending order of their installed solar power capacity:
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q19. Which state agency is designated as the nodal agency for the development of solar parks and solar power projects in Rajasthan?
RAS Prelims Rajasthan Economy · Energy Infrastructure in Rajasthan
Q20. Consider the following statements regarding solar energy initiatives in Rajasthan:
I. The PM KUSUM scheme promotes the installation of standalone solar agriculture pumps.
II. The state government allows setting up solar projects on agricultural land under the KUSUM scheme.
III. Bhadla Solar Park is the only approved solar park in the state.
IV. Rajasthan Solar Energy Policy aims to promote decentralised solar power generation.
V. The state provides massive subsidies for importing coal to balance solar variability.
Which of the above statement(s) is/are incorrect?

Answer key for these questions

QCorrect answer
11(c) 700 MW each
12(c) Chambal Valley Project - Rajasthan and Madhya Pradesh
13(b) Absence of perennial rivers and generally arid to semi-arid climatic conditions.
14(d) A-iii, B-i, C-ii, D-iv
15(a) I, III and IV
16(a) 15.2%
17(a) Both A and R are true and R is the correct explanation of A.
18(b) Rajasthan, Gujarat, Karnataka, Tamil Nadu
19(c) Rajasthan Renewable Energy Corporation Limited (RRECL)
20(d) III and V only

Key facts from Energy Infrastructure in Rajasthan

  • Under the Rajasthan Solar Energy Policy 2019, the 30 GW target gave 24 GW to utility-scale solar parks.
  • Soda Bandhan is a wind energy park in Jaisalmer.
  • The Green Energy Corridor of RVPNL evacuates solar and wind power to the national grid.
  • AT&C losses means Aggregate Technical and Commercial losses; theft, unmetered connections and poor collection cause them.
  • UDAY brought a debt takeover for DISCOMs; RDSS funds smart metering and infrastructure upgrades; PM-KUSUM solarises agricultural pumps and Saubhagya electrified households.
  • Pre-paid smart meters give upfront revenue collection; Rajasthan can be a green hydrogen hub because of its cheap renewable power.

Frequently asked questions

How many RAS Prelims practice MCQs are there on Energy Infrastructure in Rajasthan?

This page has 79 practice MCQs on Energy Infrastructure in Rajasthan (Rajasthan Economy). Each has the correct answer, and most have an explanation.

What does AT&C loss mean?

Aggregate Technical and Commercial losses, which combine the energy lost in transmission and distribution with the revenue lost through theft, billing errors and poor collection. It is the main measure of a DISCOM’s efficiency.

Which scheme is used to install smart meters in Rajasthan?

The Revamped Distribution Sector Scheme (RDSS). It supports smart metering and distribution upgrades to reduce AT&C losses, and pre-paid smart meters help DISCOMs get their revenue upfront, which improves their cash flow.

What is the solar capacity target of the 2019 policy?

30 GW, of which 24 GW is allotted to utility or grid-scale solar parks. The rest is meant for rooftop, decentralised projects and solar pumps, which together are a much smaller part of the target.