An Initiative by SAARTHI IAS
Maarg Manthan · Topic 16.4

Sagarmala; Bharatmala Pariyojana (Umbrella Programme for Highways); UDAN; PM GatiShakti

Indian Economy › Infrastructure and Investment Models · Topic 16.4

Sagarmala, Bharatmala Pariyojana, UDAN and PM GatiShakti are India's four flagship connectivity programmes. Sagarmala (launched March 2015) promotes port-led development with five pillars. Bharatmala Pariyojana (Phase I approved 24 October 2017) plans 34,800 km of National Highway corridors at an outlay of Rs 5.35 lakh crore. UDAN (Ude Desh ka Aam Nagrik, launched October 2016) is the Regional Connectivity Scheme for air travel to smaller towns. PM GatiShakti (launched 13 October 2021) is the GIS-based National Master Plan that puts all these networks on one platform so that ministries plan together.

Share:
Sagarmala; Bharatmala Pariyojana (Umbrella Programme for Highways); UDAN; PM GatiShakti - Indian Economy - MaargX UPSC Maarg Manthan

At a Glance

  • Sagarmala Launched March 2015, 5 pillars, 845 projects worth Rs 6.06 lakh crore
  • bharatmala-pariyojana-roads/" class="maargx-auto-link" data-preview="At a Glance Approved 24 October 2017 Ministry Road Transport and Highways Phase I length About 34,800 km Phase I outlay About…">Bharatmala Pariyojana Phase I approved 24 October 2017, 34,800 km, Rs 5.35 lakh crore
  • UDAN Launched October 2016, 679 routes and 95 airports (15 July 2026)
  • Modified UDAN Launched 4 July 2026, Rs 28,840 crore, FY2026-27 to FY2035-36
  • PM GatiShakti Launched 13 October 2021, six pillars, seven engines
  • GatiShakti scope 58 Ministries and Departments, 3,202 data layers (June 2026)
  • Exam link UPSC Prelims and Mains, Indian Economy: Infrastructure and Investment Models

Where Does It Fit?

This topic names the four connectivity programmes. Their wider context is in Infrastructure Development in India: Growth Drivers and Government Policy Initiatives, the highway detail is in Road Transport: National Highways, Road Sector Initiatives, RRTS, the port detail in Port Sector in India; Ports and Waterways: Inland Waterways, National Waterways, Jalvahak Scheme, and the aviation detail in Civil Aviation Sector: UDAN, Airport Development through PPP. Previous topic: NICDP Nodal ministry Department for Promotion of Industry and Internal Trade (DPIIT) Implementing agency…">Industrial Corridors and Dedicated Freight Corridors (DFC); Corridor Development and Implementation Trust; Nodal Ministry (DPIIT) and Implementing Agency. Next topic: National Infrastructure Pipeline (NIP) and Atanu Chakraborty Committee; NITI Aayog NMP 1.0 target Rs 6 lakh crore, FY 2022 to FY…">National Monetisation Pipeline (NMP).

What Are Sagarmala, Bharatmala, UDAN and PM GatiShakti?

Programme Sector and launch Core idea Verified data
Sagarmala Ports and shipping. Launched in March 2015 under the Ministry of Ports, Shipping and Waterways Port-led development: port modernisation, better hinterland connectivity, port-led industrialisation, coastal community development and coastal shipping and inland waterways 845 projects worth Rs 6.06 lakh crore taken up. As of 24 March 2026, 315 projects worth Rs 1.57 lakh crore were completed, 210 under implementation and 320 in planning
Bharatmala Pariyojana Highways. Phase I approved by the Cabinet on 24 October 2017 Flagship programme that groups economic corridors, feeder roads, border, coastal and port roads and expressways under one plan 34,800 km planned. As of March 2026, projects of 26,425 km were awarded and 22,590 km constructed
UDAN Civil aviation. Regional Connectivity Scheme launched in October 2016 Affordable regional air travel through route support to airlines and development of small airports 679 routes connect 95 airports, heliports and water aerodromes. More than 3.58 lakh flights carried over 1.68 crore passengers (15 July 2026)
PM GatiShakti All infrastructure. Launched by the Prime Minister on 13 October 2021 and cleared by the Cabinet on 21 October 2021 One GIS-based National Master Plan for multimodal connectivity so that ministries plan and execute together 58 Ministries and Departments and more than 3,202 data layers as of June 2026

How Is PM GatiShakti Built and How Does It Work?

Element What it is
Six pillars Comprehensiveness, Prioritisation, Optimisation, Synchronisation, Analytical and Dynamic. The platform shows all ministries projects on one portal, helps pick the best route in time and cost, and tracks progress with satellite imagery
Seven engines Roads, Railways, Airports, Ports, Mass Transport, Waterways and Logistics Infrastructure, supported by energy transmission, IT communication, bulk water and sewerage, and social infrastructure
Empowered Group of Secretaries (EGoS) Top tier, headed by the Cabinet Secretary, mandated to review and monitor implementation of the National Master Plan to ensure logistics efficiency
Network Planning Group (NPG) Made up of the heads of network planning wings of infrastructure ministries and departments, and assists the EGoS
Technical Support Unit (TSU) Located in the Logistics Division of the Ministry of Commerce and Industry, with domain experts in rail, roads, ports, aviation, maritime and GIS
PM GatiShakti Public Web platform giving access to 230 non-sensitive datasets to private entities, researchers and citizens
District Master Plans PM GatiShakti District Master Plans were launched for all 112 Aspirational Districts to guide social and economic infrastructure projects

What Else Should You Remember?

  • Also called: UDAN is short for Ude Desh ka Aam Nagrik, and the scheme is formally the Regional Connectivity Scheme (RCS). Bharatmala Pariyojana is also written as Bharatmala Project. PM GatiShakti is also called the PM GatiShakti National Master Plan, short form NMP
  • Sagarmala pillars: The projects are divided into 5 pillars and 24 categories. The pillars are Port Modernisation and New Port Development, Port Connectivity Enhancement, Port-Led Industrialisation, Coastal Community Development, and Coastal Shipping and Inland Waterways Transport
  • Sagarmala institutions: The National Sagarmala Apex Committee was constituted in May 2015. Sagarmala Development Company Limited, set up in August 2016, was restructured in June 2025 as Sagarmala Finance Corporation Limited, described as the first non-banking financial company focused on the maritime sector
  • Sagarmala 2.0: Proposed as the next phase, with budgetary support of Rs 85,482 crore and a total investment of Rs 3.6 lakh crore. Worked check: Rs 3.6 lakh crore of investment on Rs 85,482 crore of support means about Rs 4.2 of investment per rupee of support
  • Sagarmala job potential: The programme has an estimated employment potential of about 1 crore jobs, made up of 40 lakh direct and 60 lakh indirect jobs
  • Bharatmala components: Economic Corridors 9,000 km, Inter Corridors and Feeder Roads 6,000 km, National Corridors Efficiency Improvement 5,000 km, Border and International Connectivity Roads 2,000 km, Coastal and Port Connectivity Roads 2,000 km, Expressways 800 km, which total 24,800 km, plus 10,000 km of balance National Highways Development Programme works. Worked check: 24,800 plus 10,000 is 34,800 km
  • Bharatmala progress check: 22,590 divided by 34,800 gives 64.9 per cent of the planned length constructed, and 22,590 divided by 26,425 gives 85.5 per cent of the awarded length constructed. The plan was meant to run over 2017-18 to 2021-22, and the work continues beyond that period
  • Highway speed gain: Average freight speed on access-controlled High Speed Corridors is about 50 km/h, against 30-35 km/h on 4-lane National Highways. The access-controlled corridor length operationalised was 3,644 km as of 2026, as in Road Transport: National Highways, Road Sector Initiatives, RRTS
  • UDAN reach: Operational airports rose from 74 in 2014 to 165 on 15 July 2026. Worked check: 1.68 crore passengers divided by 3.58 lakh flights is an average of about 47 passengers per flight
  • Modified UDAN: Launched on 4 July 2026 for ten years, FY2026-27 to FY2035-36, with an outlay of Rs 28,840 crore. It develops 100 airports from unserved airstrips (Rs 12,159 crore over eight years), builds 200 helipads, gives Viability Gap Funding of Rs 10,043 crore over ten years, and supports operation and maintenance for three years
  • Modified UDAN design: Airlines receive Viability Gap Funding for up to five years with tapering from the third year, and route exclusivity is limited to three years. Operation and maintenance support is capped at Rs 3.06 crore per year per airport and Rs 0.90 crore per year per heliport or water aerodrome
  • GatiShakti freight link: As of August 2026, 142 Gati Shakti Cargo Terminals had been commissioned with a capacity of 224 million tonnes per annum, mobilising about Rs 10,000 crore of private investment, as in Railways Sector: Recent Initiatives by the Railways; DFCs; Station Redevelopment through PPP

Why Does It Matter for the Exam?

  1. Launch years: Sagarmala 2015, UDAN 2016, Bharatmala approved 2017, PM GatiShakti 2021
  2. Pillars and components: Five Sagarmala pillars, six Bharatmala components and six PM GatiShakti pillars
  3. GatiShakti tiers: Empowered Group of Secretaries, Network Planning Group and Technical Support Unit
  4. UDAN full form: Ude Desh ka Aam Nagrik, under the Regional Connectivity Scheme
  5. Common error: Saying that Bharatmala is a port scheme. It is the highway programme, and the port scheme is Sagarmala

As an analytical point, the four programmes cover the sea, the road, the sky and the planning layer. The test of success is integration: a port, highway and rail link that was planned together, as PM GatiShakti intends, costs less and opens sooner than the same links planned apart.

Why Is This Topic Important?

  • Names Which programme covers which mode
  • Years 2015, 2016, 2017, 2021
  • Structure Pillars, tiers and components

What Came Next?

The next topic covers the National Infrastructure Pipeline and the Atanu Chakraborty task force, and the National Monetisation Pipeline. Next topic: National Infrastructure Pipeline (NIP) and Atanu Chakraborty Committee; National Monetisation Pipeline (NMP).

Key People and Terms

  • Sagarmala Port-led development programme
  • Bharatmala Highway corridor programme
  • UDAN Regional air connectivity scheme
  • Modified UDAN Ten-year successor from FY2026-27
  • EGoS Empowered Group of Secretaries
  • VGF Viability Gap Funding

Exam Corner

Points to Remember

  • Sagarmala: March 2015, 5 pillars.
  • Bharatmala Phase I: 34,800 km, Rs 5.35 lakh crore.
  • UDAN: October 2016; Modified UDAN: Rs 28,840 crore.
  • PM GatiShakti: 13 October 2021, six pillars.
  • GatiShakti tiers: EGoS, NPG, TSU.

Do Not Confuse With

  • Sagarmala and Bharatmala Ports and sea routes versus highways
  • UDAN and Modified UDAN Scheme of 2016 versus the ten-year scheme launched in July 2026
  • PM GatiShakti and the National Monetisation Pipeline Planning platform versus asset monetisation list

Memory Hook

Sea is Sagarmala, road is Bharatmala, sky is UDAN, GatiShakti is the map that joins all three.

Mains Angle

Questions ask how the four programmes work together. These points give a frame.

  • Modes Port, road, air
  • Integration GatiShakti planning
  • Gaps Delays, land, viability

A Question You May Face

An original practice question, not a past paper question.

“Explain how Sagarmala, Bharatmala, UDAN and PM GatiShakti together improve India’s connectivity and logistics.”

How to Answer

  1. Define Four programmes and years.
  2. Facts 845 projects, 34,800 km, 679 routes.
  3. Link GatiShakti joins networks.
  4. Conclude Integration cuts cost.

GS Relevance

Prelims: names, launch years, components and nodal ministries of Sagarmala, Bharatmala, UDAN and PM GatiShakti. GS Paper 3: infrastructure, ports, aviation, logistics.

Frequently Asked Questions

What is the Sagarmala Programme?

Sagarmala is the port-led development programme of the Ministry of Ports, Shipping and Waterways, launched in March 2015. Its projects fall under five pillars: port modernisation, port connectivity, port-led industrialisation, coastal community development, and coastal shipping and inland waterways. About 845 projects worth Rs 6.06 lakh crore have been taken up.

What is Bharatmala Pariyojana?

Bharatmala Pariyojana is the Government's highway development programme. Phase I was approved on 24 October 2017 for 34,800 km of National Highway corridors at an outlay of Rs 5.35 lakh crore. As of March 2026, projects of 26,425 km were awarded and 22,590 km constructed.

What does UDAN stand for and what is its aim?

UDAN stands for Ude Desh ka Aam Nagrik. Launched in October 2016 as the Regional Connectivity Scheme, it makes air travel affordable and links small towns to major cities. As of 15 July 2026, 679 routes connected 95 airports, heliports and water aerodromes, with over 1.68 crore passengers carried.

What is Modified UDAN?

Modified UDAN is the ten-year successor to UDAN, launched on 4 July 2026 for FY2026-27 to FY2035-36 with an outlay of Rs 28,840 crore. It develops 100 airports from unserved airstrips, 200 helipads, gives Viability Gap Funding of Rs 10,043 crore and supports operation and maintenance for three years.

What is PM GatiShakti and how is it organised?

PM GatiShakti is the National Master Plan for multimodal connectivity, launched on 13 October 2021. It runs on six pillars and seven engines, and is monitored by an Empowered Group of Secretaries headed by the Cabinet Secretary, a Network Planning Group and a Technical Support Unit in the Logistics Division.

What is the difference between Sagarmala and Bharatmala?

Sagarmala is the port-led development programme for coasts, ports and waterways, launched in 2015, while Bharatmala Pariyojana is the highway programme, approved in 2017, covering economic corridors, feeder roads, border and coastal roads and expressways. Both are linked on the PM GatiShakti platform.

PYQ Practice — Statement Analysis

1 Sagarmala is a programme for highways and expressways.
False

It is the port-led development programme. Bharatmala is the highway programme.

2 The Technical Support Unit of PM GatiShakti is located in the Logistics Division of the Ministry of Commerce and Industry.
True

It supports the Network Planning Group with domain experts.

3 Bharatmala Pariyojana Phase I plans 34,800 km of National Highway corridors.
True

The Cabinet approved it on 24 October 2017 with an outlay of Rs 5.35 lakh crore.

4 UDAN stands for Ude Desh ka Aam Nagrik.
True

It is the Regional Connectivity Scheme launched in October 2016.

5 The Empowered Group of Secretaries of PM GatiShakti is headed by the Cabinet Secretary.
True

It reviews and monitors implementation of the National Master Plan.

Share: