India's National Highway (NH) network has grown from 91,287 km in 2013-14 to 1,46,572 km in March 2026, a rise of about 61 per cent, and the country has the second-largest road network in the world at 63.73 lakh km. The main road programmes are Bharatmala Pariyojana (34,800 km planned, 22,590 km constructed by 31 March 2026), the Pradhan Mantri Gram Sadak Yojana for rural roads, access-controlled High Speed Corridors (3,644 km operational) and FASTag tolling. For urban and regional commuting India now has the Regional Rapid Transit System (RRTS): the 82.15 km Delhi-Ghaziabad-Meerut Namo Bharat corridor has been fully operational since February 2026.
6 min read · UPSC Prelims and Mains · Indian Economy · Infrastructure and Investment Models
At a Glance
- National Highways 1,46,572 km (March 2026), up from 91,287 km in 2013-14
- Road network 63.73 lakh km, second largest in the world
- 4-lane and above NHs 45,516 km, from 18,371 km in 2014
- High Speed Corridors 3,644 km access-controlled, operational
- Bharatmala 22,590 km constructed of 34,800 km planned (31 March 2026)
- RRTS 82.15 km Delhi-Ghaziabad-Meerut, fully operational since February 2026
- Exam link UPSC Prelims and Mains, Indian Economy: Infrastructure and Investment Models
Where Does It Fit?
This topic covers the road mode. The programme context is in sagarmala-bharatmala-pariyojana-umbrella-programme-for-highways-udan-pm-gatishakti/" class="maargx-auto-link" data-preview="At a Glance Sagarmala Launched March 2015, 5 pillars, 845 projects worth Rs 6.06 lakh crore Bharatmala Pariyojana Phase I approved 24…">Sagarmala; Bharatmala Pariyojana (Umbrella Programme for Highways); UDAN; PM GatiShakti, the budget context in Infrastructure Development in India: Growth Drivers and Government Policy Initiatives, and the Mains view with the 2026-27 Budget in Roads: Budget 2026-27 highlights, significance, issues, measures, way forward; PM GatiShakti; RRTS. Previous topic: National Logistics Policy; Logistics Efficiency and Advancement Predictability and Safety Act. Next topic: Railways Sector: Recent Initiatives by the Railways; DFCs; Station Redevelopment through PPP.
What Are the Key Facts of India’s National Highways?
| Indicator | Earlier figure | Latest verified figure |
|---|---|---|
| Length of National Highways | 91,287 km (2013-14); 1,32,499 km (March 2019) | 1,46,572 km (March 2026). Worked check: (1,46,572 minus 91,287) divided by 91,287 is 60.6 per cent |
| Four-lane and above NHs | 18,371 km (2014); 31,066 km (2019) | 45,516 km, which is 2.5 times the 2014 length |
| Share of NHs with less than two lanes | 27 per cent (2019) | 9 per cent (December 2025) |
| Access-controlled High Speed Corridors | 3,052 km operational (December 2025) | 3,644 km operational (2026) |
| Pace of NH construction | About 11.6 km per day (2013-14) | Nearly 34 km per day (2025) |
| NH built in five financial years | Not applicable | About 57,125 km constructed in the last five financial years (reply of December 2025) |
| Freight speed | 30-35 km/h on 4-lane NHs | About 50 km/h on High Speed Corridors |
| Toll collection | FASTag started in 2016 | 11.86 crore FASTags issued (December 2025), with over 98 per cent of highway toll collected electronically |
What Are the Main Road Sector Initiatives and Landmark Projects?
| Initiative or project | Key facts |
|---|---|
| Bharatmala Pariyojana | Approved October 2017 for 34,800 km at Rs 5.35 lakh crore. As of March 2026, 26,425 km awarded and 22,590 km constructed, as in Sagarmala; Bharatmala Pariyojana (Umbrella Programme for Highways); UDAN; PM GatiShakti |
| Pradhan Mantri Gram Sadak Yojana (PMGSY) | Rural roads. Allocation rose from Rs 386 crore in 2014-15 to Rs 19,000 crore in 2026-27. About 99.6 per cent of eligible habitations are connected, 4.11 lakh km of roads were completed from 2014 to 2026, and completed bridges rose from 484 to 10,293 |
| Delhi-Mumbai Expressway | Planned length about 1,386 km at about Rs 1 lakh crore, set to be the country’s longest access-controlled expressway. The first 246 km section (Delhi-Dausa-Lalsot) opened on 12 February 2023 |
| Delhi-Dehradun Economic Corridor | 213 km, six-lane, access-controlled, Rs 12,000 crore, inaugurated on 14 April 2026. Travel time fell from over six hours to about 2.5 hours and distance from 235 km to 213 km |
| Ahmedabad-Dholera Expressway | 109 km, completed in 2026 and linked to the Dholera region, as in NICDP Nodal ministry Department for Promotion of Industry and Internal Trade (DPIIT) Implementing agency…">Industrial Corridors and Dedicated Freight Corridors (DFC); Corridor Development and Implementation Trust; Nodal Ministry (DPIIT) and Implementing Agency |
| Bengaluru-Mysuru Expressway | 118 km, about Rs 8,480 crore, inaugurated on 12 March 2023. Travel time fell from nearly three hours to about 75 minutes |
| Atal Tunnel | 9.02 km, the world’s longest highway tunnel above 10,000 feet, opened in 2020 |
| Budget 2026-27 | The Minister of State for Road Transport and Highways said that approximately Rs 3 lakh crore is allocated for road infrastructure, and the Infrastructure Risk Guarantee Fund is expected to strengthen BOT and PPP models |
What Else Should You Remember?
- Also called: Access-controlled National High Speed Corridors are commonly called expressways. FASTag is the Electronic Toll Collection system under NETC. RRTS stands for Regional Rapid Transit System, and its trains are branded Namo Bharat
- Largest network: At 63.73 lakh km, India has the second-largest road network in the world, according to a PIB backgrounder of June 2026
- Rural roads: PMGSY builds all-weather rural roads, and its allocation of Rs 19,000 crore in 2026-27 is about 49 times that of 2014-15. Worked check: 19,000 divided by 386 is 49.2
- What is RRTS: The Regional Rapid Transit System is a rail-based, semi-high-speed, high-frequency commuter transit system. The Delhi-Ghaziabad-Meerut corridor was the first, with foundation laid on 8 March 2019
- First section: The Prime Minister inaugurated the 17 km priority section from Sahibabad to Duhai Depot on 20 October 2023. The Meerut section and Meerut Metro were inaugurated on 22 February 2026
- Namo Bharat length: The corridor is 82.15 km long and includes 23 km of Meerut Metro network on the same infrastructure. It has become fully operational since February 2026
- Ridership and speed: Over 3.8 crore commuters had used Namo Bharat services by August 2026, with punctuality over 99 per cent. The trains run at 160 km/h with a design speed of 180 km/h
- Integration: The corridor is integrated with 3 Metro lines, 2 Railway stations and 4 Bus terminals. A 35 per cent discount on base fare is given to all commuters
- Implementing agency: The National Capital Region Transport Corporation (NCRTC) is the implementing agency. The Ministry of Housing and Urban Affairs answers for it in Parliament
- Next RRTS corridors: Phase I prioritised three corridors: Delhi-Ghaziabad-Meerut, Delhi-Gurugram-Alwar and Delhi-Panipat. NCRTC has submitted Detailed Project Reports for Delhi to Karnal, Delhi to Bawal, Bawal to Behror and Ghaziabad to Noida International Airport, which are under examination
- Signalling: The Delhi-Meerut corridor uses ETCS Hybrid Level-III signalling
Why Does It Matter for the Exam?
- Network numbers: NH length 1,46,572 km, 4-lane and above 45,516 km, High Speed Corridors 3,644 km
- Programme facts: Bharatmala 34,800 km and PMGSY for rural roads
- RRTS: Namo Bharat on the Delhi-Ghaziabad-Meerut corridor, 82.15 km, built by NCRTC
- Toll: FASTag is electronic toll collection and over 98 per cent of toll is collected through it
- Common error: Confusing RRTS with metro. RRTS is semi-high-speed regional rail, while the metro on the corridor is Meerut Metro
As an analytical point, the road sector has moved from adding lane-kilometres to building high-speed, access-controlled corridors and tying toll and logistics data together. RRTS adds a regional rail layer that shifts commuters off the roads in the national capital region.
Why Is This Topic Important?
- Numbers NH length and corridor length
- Programmes Bharatmala and PMGSY
- RRTS Namo Bharat facts
What Came Next?
The next topic covers the railways sector, recent initiatives, the freight corridors and station redevelopment. Next topic: Railways Sector: Recent Initiatives by the Railways; DFCs; Station Redevelopment through PPP.
Key People and Terms
- NH National Highway
- HSC High Speed Corridor
- PMGSY Rural roads scheme
- FASTag Electronic toll tag
- RRTS Regional Rapid Transit System
- NCRTC RRTS implementing agency
Exam Corner
Points to Remember
- NH length: 1,46,572 km (March 2026).
- High Speed Corridors: 3,644 km.
- Bharatmala built: 22,590 km of 34,800 km.
- Namo Bharat: 82.15 km, full operation February 2026.
- FASTag: over 98 per cent of toll collection.
Do Not Confuse With
- RRTS and Metro Semi-high-speed regional rail versus city rail
- Bharatmala and PMGSY National Highway corridors versus rural roads
- NHAI and NCRTC Highway agency versus regional rail corporation
Memory Hook
Highways are 1.47 lakh km, expressways 3,644 km, Namo Bharat 82 km.
Mains Angle
Questions ask about achievements, gaps and the way forward in roads. These points give a frame.
- Growth NH length and speed
- Reach Rural roads and RRTS
- Issues Funding and safety
A Question You May Face
An original practice question, not a past paper question.
“Discuss the progress of India’s road sector and the role of RRTS in regional connectivity.”
How to Answer
- Intro NH 1,46,572 km.
- Programmes Bharatmala, PMGSY.
- RRTS Namo Bharat 82.15 km.
- Conclude Safety and funding next.
GS Relevance
Frequently Asked Questions
How long is the National Highway network in India?
India's National Highway network was 1,46,572 km in March 2026, up about 61 per cent from 91,287 km in 2013-14. Four-lane and wider highways grew from 18,371 km in 2014 to 45,516 km, and 3,644 km of access-controlled High Speed Corridors are operational.
What is Bharatmala Pariyojana and how much is complete?
Bharatmala Pariyojana is the Government's highway corridor programme, approved in October 2017 for 34,800 km at Rs 5.35 lakh crore. As of 31 March 2026, projects of 26,425 km had been awarded and 22,590 km constructed, which is about 65 per cent of the planned length.
What is the Pradhan Mantri Gram Sadak Yojana?
The Pradhan Mantri Gram Sadak Yojana (PMGSY) builds all-weather rural roads. About 99.6 per cent of eligible habitations are connected, 4.11 lakh km of roads were completed from 2014 to 2026, and the allocation for 2026-27 is Rs 19,000 crore, against Rs 386 crore in 2014-15.
What is RRTS and Namo Bharat?
The Regional Rapid Transit System (RRTS) is a rail-based, semi-high-speed, high-frequency commuter system, and its trains are branded Namo Bharat. The 82.15 km Delhi-Ghaziabad-Meerut corridor was built by NCRTC and has been fully operational since February 2026.
What is the status of Delhi-Meerut Namo Bharat?
The corridor of 82.15 km, which includes 23 km of Meerut Metro network on the same infrastructure, is fully operational since February 2026. Over 3.8 crore commuters had used it by August 2026, with punctuality above 99 per cent. Delhi-Gurugram-Alwar and Delhi-Panipat are the other Phase I corridors.
What is FASTag?
FASTag is India's electronic toll collection system under NETC, started in 2016, that allows toll payment without stopping. As of December 2025, 11.86 crore FASTags had been issued and over 98 per cent of highway toll collection took place through FASTag-based electronic transactions.
PYQ Practice — Statement Analysis
1 The Delhi-Meerut Namo Bharat corridor is 82.15 km long.
It includes 23 km of Meerut Metro network on the same infrastructure.
2 NCRTC is the implementing agency for Namo Bharat RRTS.
National Capital Region Transport Corporation Limited.
3 PMGSY is a scheme for urban metro expansion.
It is the rural road scheme.
4 Bharatmala Pariyojana Phase I plans 34,800 km of National Highway corridors.
Approved by the Cabinet in October 2017.
5 India's National Highway network is under 1 lakh km.
It was 1,46,572 km in March 2026.
Related Topics