Renewable Energy: Installed Capacity, Solar Power, Government Initiatives
Indian Economy › Infrastructure and Investment Models · Topic 16.13
Renewable energy in India is electricity from sources that are naturally replenished, mainly solar, wind, hydro, biomass and, increasingly, green hydrogen. India's non-fossil installed capacity crossed 300 GW in 2026 and stood at 300.50 GW on 31 July 2026, of which solar was 164.59 GW, up from 2.8 GW in 2014, and wind 58.14 GW. The country aims for 500 GW of non-fossil capacity by 2030. Key government initiatives include the PM Surya Ghar: Muft Bijli Yojana for rooftop solar, which crossed 50 lakh installations in July 2026, PM-KUSUM, the National Green Hydrogen Mission and the International Solar Alliance.
6 min read · UPSC Prelims and Mains · Indian Economy · Infrastructure and Investment Models
At a Glance
- Non-fossil capacity 300.50 GW (31 July 2026)
- Solar 164.59 GW, from 2.8 GW in 2014
- Wind 58.14 GW
- Rooftop solar 14.8 GW commissioned (12 August 2026)
- PM Surya Ghar Over 50 lakh households (July 2026)
- 2030 target 500 GW non-fossil capacity
- Exam link UPSC Prelims and Mains, Indian Economy: Infrastructure and Investment Models
Where Does It Fit?
This topic builds on the sources and grid in Energy and Power Sector: Sources of Energy (Conventional and Non-Conventional); Government Policy Support for the Energy Sector; Green Energy Corridor; LED Programme. The Mains analysis is in Renewable energy: installed capacity, progress and prospects, initiatives, benefits, challenges, solar power; key focus areas, and the investment side links to Infrastructure Investment; NIIF; India Infrastructure Project Development Fund (IIPDF). Previous topic: Energy and Power Sector: Sources of Energy (Conventional and Non-Conventional); Government Policy Support for the Energy Sector; Green Energy Corridor; LED Programme. Next topic: Investment Models: Public Sector-Led and Private Sector-Led Investment Models.
How Big Is India’s Renewable Capacity?
| Indicator | Earlier | Latest verified figure |
|---|---|---|
| Non-fossil capacity | Not applicable | 300.50 GW on 31 July 2026, over 54 per cent of the total of about 552 GW |
| Solar capacity | 2.8 GW (2014) | 164.59 GW on 31 July 2026. Worked check: 164.59 divided by 2.8 is about 59 times |
| Wind capacity | Not applicable | 58.14 GW on 31 July 2026 |
| Hydro, bio-power and nuclear | Not applicable | 57.24 GW, 11.75 GW and 8.78 GW respectively on 31 July 2026 |
| Non-fossil capacity added | Not applicable | Over 55 GW during 2025-26 |
| Rooftop solar | Not applicable | 14.8 GW commissioned as of 12 August 2026 under PM Surya Ghar |
| Storage outlook | Not applicable | About 74 GW by 2031-32, including about 27 GW of pumped storage and over 47 GW of battery storage |
| Target | Not applicable | 500 GW of non-fossil capacity by 2030, so about 200 GW more is needed from 300.50 GW |
Which Government Initiatives Promote Renewable Energy?
| Initiative | Facts |
|---|---|
| PM Surya Ghar: Muft Bijli Yojana | Launched in February 2024 to install rooftop solar in 1 crore households. It crossed 50 lakh installations in July 2026, and over 5 lakh homes were added in July 2026 alone. The target is 1 crore households by 2026-27 |
| PM-KUSUM | The Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan supports farmers with solar pumps, solarisation of grid pumps and small decentralised solar plants |
| National Green Hydrogen Mission | Approved in January 2023 to make India a global hub for green hydrogen production and use, with an outlay of Rs 19,744 crore and a target of 5 million tonnes a year by 2030 |
| International Solar Alliance (ISA) | A treaty-based alliance of solar-rich countries launched by India and France at the Paris climate conference in November 2015. Its headquarters is in Gurugram, India |
| Production Linked Incentive for solar modules | A scheme with an outlay of Rs 24,000 crore to build domestic manufacturing of high-efficiency solar modules and reduce import dependence |
| Approved List of Models and Manufacturers (ALMM) | A list of approved solar modules and cells that projects under government schemes must use, to promote domestic manufacturing |
| Green Energy Corridor | Transmission lines and sub-stations to carry renewable power into the grid, as in Energy and Power Sector: Sources of Energy (Conventional and Non-Conventional); Government Policy Support for the Energy Sector; Green Energy Corridor; LED Programme |
What Else Should You Remember?
- Also called: Renewable energy is also called clean energy or non-conventional energy. Non-fossil capacity includes large hydro and nuclear, which are not counted as new and renewable energy in some official tables. RE means renewable energy and GW means gigawatt
- Solar power: Solar is the largest source of renewable capacity. It is generated by photovoltaic panels on utility-scale plants, rooftops and farms, and by solar thermal plants. Solar has grown from 2.8 GW in 2014 to 164.59 GW in 2026
- Wind power: Wind capacity of 58.14 GW is concentrated in a few States, with Tamil Nadu, Gujarat and Karnataka as major producers
- Rooftop solar: Households install panels on their roofs under PM Surya Ghar with central financial assistance and can sell surplus power to the distribution company through net metering
- Intermittency: Solar and wind output varies with weather and time of day. Storage, pumped hydro and transmission are needed to use it fully, as in Energy and Power Sector: Sources of Energy (Conventional and Non-Conventional); Government Policy Support for the Energy Sector; Green Energy Corridor; LED Programme
- Green hydrogen: Hydrogen made by splitting water with renewable electricity. It is meant for steel, fertilisers and refining, where direct electrification is hard
- Hybrid and storage: Solar plus wind hybrid projects and battery storage systems are used to give steadier supply
- International links: India’s climate targets and its role in the International Solar Alliance link renewable growth to global climate action
- Link to jobs and manufacturing: Solar module manufacturing and PLI support create industrial jobs but also depend on imported cells and wafers
- Exam hint: Questions ask which scheme covers which beneficiary: PM Surya Ghar for households, PM-KUSUM for farmers and the National Green Hydrogen Mission for hydrogen
- Common errors: Confusing PM Surya Ghar with PM-KUSUM. Surya Ghar is rooftop solar for homes, while KUSUM is for farm pumps and plants
Why Does It Matter for the Exam?
- Capacity: Non-fossil 300.50 GW, solar 164.59 GW (31 July 2026)
- PM Surya Ghar: Rooftop solar for 1 crore households, over 50 lakh done by July 2026
- Green hydrogen mission: January 2023, Rs 19,744 crore, 5 million tonnes by 2030
- ISA: Launched 2015 by India and France, headquarters in Gurugram
- Target: 500 GW non-fossil capacity by 2030
As an analytical point, India has moved from proving that solar is viable to managing its scale. The next questions are less about adding gigawatts and more about grid access, storage, domestic cell and wafer manufacturing and the fair sharing of costs between consumers and distribution companies.
Why Is This Topic Important?
- Capacity Solar, wind, hydro numbers
- Schemes Surya Ghar, KUSUM, Hydrogen Mission
- Targets 500 GW by 2030
What Came Next?
The next topic covers investment models, both public sector-led and private sector-led. Next topic: Investment Models: Public Sector-Led and Private Sector-Led Investment Models.
Key People and Terms
- Non-fossil capacity Solar, wind, hydro, nuclear and bio
- Net metering Selling surplus rooftop power to the grid
- PM-KUSUM Scheme for farm solar pumps and plants
- ALMM Approved list of solar models
- ISA International Solar Alliance
- Green hydrogen Hydrogen from renewable power
Exam Corner
Points to Remember
- Solar: 164.59 GW (31 July 2026).
- Non-fossil: 300.50 GW; target 500 GW by 2030.
- PM Surya Ghar: 1 crore homes target; 50 lakh done.
- Green hydrogen mission: Rs 19,744 crore, 5 million tonnes.
- ISA headquarters: Gurugram.
Do Not Confuse With
- PM Surya Ghar and PM-KUSUM Household rooftop solar versus farm solar pumps and plants
- Installed capacity and generation Rating of plants versus electricity actually produced
- ISA and IRENA Solar alliance versus the wider renewable energy agency
Memory Hook
Surya for the home, KUSUM for the farm, and hydrogen for the heavy industry.
Mains Angle
Questions on renewable energy ask about progress, benefits and challenges. These points give a frame.
- Progress 300.50 GW, solar 164.59 GW
- Initiatives Surya Ghar, KUSUM, hydrogen
- Challenges Storage, grid, imports
A Question You May Face
An original practice question, not a past paper question.
“Evaluate India’s progress in renewable energy and discuss the role of rooftop solar and green hydrogen in meeting its 2030 target.”
How to Answer
- Intro 300.50 GW non-fossil in July 2026.
- Progress Solar growth, rooftop scheme.
- Challenges Intermittency, storage, imports.
- Conclude Grid and storage decide the pace.
GS Relevance
Frequently Asked Questions
What is India's renewable energy capacity?
India's non-fossil installed capacity was 300.50 GW on 31 July 2026, over 54 per cent of the total. Solar was 164.59 GW, wind 58.14 GW, hydro 57.24 GW, bio-power 11.75 GW and nuclear 8.78 GW, and India aims for 500 GW of non-fossil capacity by 2030.
What is the PM Surya Ghar: Muft Bijli Yojana?
PM Surya Ghar: Muft Bijli Yojana is the rooftop solar scheme launched in February 2024 to install solar panels in 1 crore households. It crossed 50 lakh installations in July 2026, with 14.8 GW of rooftop solar commissioned as of 12 August 2026.
What is PM-KUSUM?
PM-KUSUM, the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan, supports farmers with standalone solar pumps, solarisation of grid-connected pumps and small decentralised solar plants, so that farmers can cut diesel and electricity costs and earn from surplus power.
What is the National Green Hydrogen Mission?
The National Green Hydrogen Mission, approved in January 2023 with an outlay of Rs 19,744 crore, aims to make India a global hub for green hydrogen with a target of 5 million tonnes of production a year by 2030, for use in industries such as steel and fertilisers.
What is the International Solar Alliance?
The International Solar Alliance is a treaty-based alliance of solar-rich countries launched by India and France at the Paris climate conference in November 2015. Its headquarters is in Gurugram, and it promotes solar deployment and finance.
How much has India's solar capacity grown?
India's solar capacity grew from 2.8 GW in 2014 to 164.59 GW on 31 July 2026, about 59 times higher. India added over 55 GW of non-fossil capacity in 2025-26, led by solar and wind.
PYQ Practice — Statement Analysis
1 The International Solar Alliance has its headquarters in Gurugram, India.
It was launched by India and France in 2015.
2 PM Surya Ghar provides solar pumps to farmers.
It is a rooftop solar scheme for households. Solar pumps are under PM-KUSUM.
3 India's non-fossil capacity crossed 300 GW in 2026.
It was 300.50 GW on 31 July 2026.
4 The National Green Hydrogen Mission targets 5 million tonnes of green hydrogen a year by 2030.
The mission was approved in January 2023.
5 Solar is the smallest source of India's non-fossil capacity.
At 164.59 GW it is the largest.
Related Topics
Browse the full Indian Economy index