PM-KUSUM Scheme (Solar Pumps for Farmers)
Current Affairs & Government Schemes › Energy and Renewable Energy Schemes · Topic 12.3
PM-KUSUM, the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan, is a Central Sector scheme of the Ministry of New and Renewable Energy, approved by the Union Cabinet in 2019, to give farmers solar power and cut diesel use in agriculture. It has three components: 10,000 MW of small decentralised solar plants, 20 lakh stand-alone solar pumps and the solarisation of 15 lakh grid-connected pumps, together aimed at 30.8 GW of solar capacity by March 2022 in the original plan. The target date was extended to 31 March 2026, with dates for some components revised again in March 2026.
6 min read · UPSC Prelims · Current Affairs & Government Schemes · Energy and Renewable Energy Schemes
At a Glance
- Ministry New and Renewable Energy
- Approved 2019
- Type Central Sector Scheme
- Components A, B and C
- Funding pattern for pumps 30 percent Centre, 30 percent State, 40 percent farmer
- Exam link UPSC Prelims, Current Affairs and Government Schemes: Energy and Renewable Energy Schemes
Where Does It Fit?
This topic extends solar power from households, covered in the earlier topic, to farmers. It also ties energy policy to agriculture and groundwater, and it links to the national solar targets. Previous topic: PM Surya Ghar Muft Bijli Yojana (Rooftop Solar). Next topic: National Green Hydrogen Mission.
What Are the Three Components of PM-KUSUM?
| Component | Target and design |
|---|---|
| Component A | 10,000 MW of decentralised, grid-connected solar or other renewable plants of 500 kW to 2 MW, set up on barren or fallow land by farmers, cooperatives, panchayats or developers. Distribution companies buy the power at a tariff fixed by the State regulator, and get a performance based incentive of Rs 0.40 per unit |
| Component B | 20 lakh stand-alone solar agriculture pumps of up to 7.5 HP capacity to replace diesel pumps in areas without grid power |
| Component C, individual pump solarisation | Solarisation of 15 lakh grid-connected agriculture pumps, where the farmer can use solar power and sell surplus to the distribution company |
| Component C, feeder level solarisation | Solarisation of whole agriculture feeders so that farmers get daytime power |
| Total aim | The original aim was 30.8 GW of solar capacity by March 2022, and the Central support was about Rs 34,422 crore |
| Benchmark | Central Financial Assistance is given on the benchmark cost or the tender cost, whichever is lower |
How Is the Scheme Funded and Run?
- Funding pattern for pumps: the Central Financial Assistance is 30 percent of the cost, the State gives 30 percent and the farmer pays 40 percent, of which 30 percent can be taken as a bank loan
- Special category States: for the North East, hill States and islands, the Central assistance is 50 percent
- Implementing agencies: State nodal agencies and distribution companies carry out the work, under the Ministry of New and Renewable Energy
- Net metering for Component C: surplus power from solarised grid pumps is bought by the distribution company, which gives farmers a second income
- Eligibility: farmers with agricultural land, cooperatives, panchayats, farmer producer organisations and water user associations can take part
- Pump size: stand-alone pumps of 3 HP, 5 HP, 7.5 HP and higher are supported, with a cap on Central assistance for the size
- Link with feeders: feeder level solarisation reduces the cost of power subsidy for distribution companies, as the power is generated close to use
- Link with other rural energy: the scheme complements efforts for household solar, as in PM Surya Ghar Muft Bijli Yojana (Rooftop Solar)
What Else Should You Remember?
- Full form: Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan, whose letters spell KUSUM
- Objectives: reduce diesel use in farming, cut the subsidy burden on distribution companies, give farmers extra income and raise renewable capacity
- Original time frame: the scheme was approved in 2019 for completion by 31 March 2022. Delays during the Covid pandemic led to an extension to 31 March 2026
- March 2026 revision: as reported, the ministry moved some deadlines in March 2026, with financial closure for Component A and feeder level work extended to 30 September 2026 and commissioning to 31 March 2027, and commissioning for Component B and individual pump solarisation by 30 September 2026
- Successor plan: as reported in April 2026, a proposed PM-KUSUM 2.0 is under consideration, and committed liabilities are to be carried forward. Whether it has been approved should be checked
- Progress: as reported for September 2025, Component B had reached about 71 percent of its target, while Component A and Component C had achieved far less, so progress is uneven
- Why Component A lags: small plants need finance, land and grid connection, and distribution companies were slow to sign power purchase agreements
- Groundwater concern: free daytime power from solar pumps may encourage overuse of groundwater, a risk in Punjab, Haryana, Rajasthan and Gujarat
- Solar water pumps and micro-irrigation: experts suggest linking pumps with drip irrigation and buying back surplus power to save water
- Farm power subsidy: State governments give power at free or low rates to farmers, and feeder level solar can bring down this subsidy bill
- Constitutional link: electricity is on the Concurrent List, which is why States share costs and administer many parts of the scheme
- Related climate goal: the scheme supports the national goal of 500 GW non-fossil capacity, as in National Solar Mission (Jawaharlal Nehru National Solar Mission)
Why Does It Matter for the Exam?
- Full form: Kisan Urja Suraksha evam Utthaan Mahabhiyan
- Components: the type of each component and the target such as 10,000 MW and 20 lakh pumps
- Funding: 30:30:40 pattern and the special case for the North East
- Ministry and type: Ministry of New and Renewable Energy and Central Sector Scheme
- Common errors: swapping Component B with Component C, or giving the wrong funding split
As an analytical point, solar pumps cut diesel costs and emissions, but they can worsen groundwater depletion if power is free. The better design pairs solar with metering, water saving irrigation and a buyback of surplus power so that farmers have a reason to save water.
Why Is This Topic Important?
- Components A, B and C targets
- Funding 30:30:40
- Issues Groundwater and slow progress
What Came Next?
The next topic covers the national mission for green hydrogen. Next topic: National Green Hydrogen Mission.
Key People and Terms
- KUSUM Kisan Urja Suraksha evam Utthaan Mahabhiyan
- Stand-alone pump Solar pump not linked to the grid
- Feeder solarisation Solar power for a farm feeder
- CFA Central Financial Assistance
- HP Horse power of a pump
- Net metering Billing on net power use
Exam Corner
Points to Remember
- Approved 2019; Ministry of New and Renewable Energy.
- Targets: 10,000 MW, 20 lakh pumps, 15 lakh grid pumps.
- Funding: 30:30:40.
- Deadline extended to 31 March 2026, further revised.
- KUSUM 2.0 proposed, as reported.
Do Not Confuse With
- PM-KUSUM and PM Surya Ghar Farmers and pumps versus household rooftops
- Component B and Component C Stand-alone pumps versus grid-connected pump solarisation
- Central Sector and Centrally Sponsored Fully Central scheme versus a cost sharing scheme with States
Memory Hook
A for plants, B for stand-alone pumps, C for grid pumps and feeders: thirty, thirty, forty.
Mains Angle
Questions ask whether solar can fix farm power problems. These points give a balanced frame.
- Benefits Diesel savings, farm income, lower power subsidy
- Concerns Groundwater, slow uptake, finance
- Way forward Drip links, buyback, finance access
A Question You May Face
An original practice question, not a past paper question.
“Discuss the objectives of PM-KUSUM and examine how it can balance farm energy needs with groundwater sustainability.”
How to Answer
- Aim Solar power for farms.
- Method Three components, shared costs.
- Gaps Slow progress, groundwater.
- Way Drip links and metering.
GS Relevance
Frequently Asked Questions
What is PM-KUSUM?
PM-KUSUM, or Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan, is a Central Sector scheme of the Ministry of New and Renewable Energy approved in 2019. It supports small solar plants, stand-alone solar pumps and the solarisation of grid-connected pumps, so that farmers get clean power and income.
What are the three components of PM-KUSUM?
Component A sets up 10,000 MW of decentralised grid-connected solar plants on barren land. Component B installs 20 lakh stand-alone solar pumps. Component C solarises 15 lakh grid-connected agriculture pumps and whole farm feeders, allowing farmers to sell surplus power to the distribution company.
Who is eligible for PM-KUSUM?
Farmers who own agricultural land, along with cooperatives, panchayats, farmer producer organisations and water user associations, can take part. Component A also allows developers to set up plants. Eligibility for pumps depends on land, water source and the pump capacity limits set under the scheme and by State agencies.
How is a solar pump funded under PM-KUSUM?
The Central Financial Assistance is 30 percent of the benchmark or tender cost, the State government adds 30 percent, and the farmer pays 40 percent, of which 30 percent can be raised as a bank loan. For the North East, hill States and islands, the Central share rises to 50 percent.
Which ministry runs PM-KUSUM?
The Ministry of New and Renewable Energy runs PM-KUSUM, with State nodal agencies and distribution companies handling implementation. It is a Central Sector Scheme in which the Centre provides assistance directly, while States add their own share for pumps and approve beneficiaries and vendors.
What is the latest status of PM-KUSUM?
The scheme was extended to 31 March 2026, and as reported the ministry moved some commissioning dates to September 2026 and March 2027 for committed projects. A successor, PM-KUSUM 2.0, was reported to be under consideration in April 2026. Check the ministry notifications for the current position.
PYQ Practice — Statement Analysis
1 PM-KUSUM has three components named A, B and C.
Plants, stand-alone pumps and grid pump solarisation.
2 Under PM-KUSUM the farmer pays 30 percent of the pump cost.
The farmer pays 40 percent. The Centre and State pay 30 percent each.
3 PM-KUSUM is run by the Ministry of New and Renewable Energy.
It is a Central Sector Scheme.
4 Component B covers feeder level solarisation.
That is part of Component C. Component B is stand-alone pumps.