Maarg Manthan · Topic 10.8

National Broadband Mission

Current Affairs & Government Schemes › Digital India and Technology Schemes · Topic 10.8

The National Broadband Mission (NBM) is a Department of Telecommunications initiative of the Ministry of Communications, launched on 17 December 2019, to speed up broadband access across India, especially in rural and remote areas. The first mission had targets to 2022 for broadband in all villages and a large fibre network. National Broadband Mission 2.0, unveiled on 17 January 2025 and effective from April 2025, sets targets to 2030: fibre to about 2.7 lakh villages, broadband for 90 per cent of anchor institutions such as schools and health centres, a fixed broadband speed of 100 Mbps, and 60 rural subscribers per 100 people. It is guided by the National Digital Communications Policy, 2018.

Share:
National Broadband Mission - Current Affairs & Government Schemes - MaargX UPSC Maarg Manthan

At a Glance

  • Agency Department of Telecommunications
  • NBM launched 17 December 2019
  • NBM 2.0 Unveiled January 2025, effective April 2025
  • Target year 2030
  • Policy base National Digital Communications Policy, 2018
  • Exam link UPSC Prelims, Current Affairs and Government Schemes: Digital India and Technology Schemes

Where Does It Fit?

This is the eighth topic of the macro on Digital India and technology. It is the policy umbrella over the BharatNet Project and over public Wi-Fi, and it sets the national connectivity targets. Previous topic: e-Kranti and MyGov Platform. Next topic: India Stack and Open Network for Digital Commerce (ONDC).

What Are the Goals of the National Broadband Mission?

Element Detail
Launch 17 December 2019 by the Department of Telecommunications, with a Broadband Commission and a Project Management Unit
First mission aims Broadband for all villages by 2022, a large increase in optical fibre route length, tower density and right of way approvals
Policy base National Digital Communications Policy, 2018, which aimed at 50 Mbps broadband for all and 1 crore public Wi-Fi hotspots by 2020, and it replaced the National Telecom Policy of 2012
NBM 2.0 Vision document unveiled on 17 January 2025, effective from 1 April 2025 and running to 2030
NBM 2.0 fibre target About 2.7 lakh villages with operational fibre and good uptime, up from a much lower base
NBM 2.0 institutions Broadband for 90 per cent of schools, primary health centres, anganwadi centres and panchayat offices
NBM 2.0 quality Average fixed download speed to 100 Mbps and 60 rural internet subscribers per 100 population, with 30 per cent of mobile towers on clean power

How Does the Mission Remove Obstacles?

  • Right of way: The Right of Way Rules of 2016 and 2024 set uniform fees and procedures for laying fibre across States. The Gati Shakti Sanchar portal gives single window approval
  • Fibre mapping: Government and public sector fibre is mapped on the PM Gati Shakti platform, with most of it reported mapped
  • Funding: The Digital Bharat Nidhi supports rural projects, as in BharatNet Project
  • Wi-Fi: Public hotspots are promoted under a licence-free scheme, as in PM-WANI (Wi-Fi Access Network Interface)
  • Present position: The data on subscribers and speed are from the vision document and sources vary by date, so cite the Department of Telecommunications for current numbers
  • Digital India: The mission supports the Broadband Highways pillar of the Digital India Programme, as in Digital India Programme

What Else Should You Remember?

  • Telecom law: The Telecommunications Act, 2023 replaced the Indian Telegraph Act, 1885, and covers right of way and satellite spectrum
  • Spectrum: Satellite broadband will use administratively assigned spectrum under the new law
  • 5G: Rollout of 5G began in October 2022 and mobile broadband now carries a large share of Indian internet use
  • Mobile towers: Tower density and fiberisation of towers are needed for 5G and for broadband quality
  • Fixed broadband: Fixed broadband subscribers are fewer than mobile data users, so home fibre is still a small part of access
  • Anchor institutions: Schools and health centres are targeted first because they bring benefits to the community
  • Digital divide: Rural and women users lag, and cost of devices and data is a barrier
  • Sharing: Infrastructure sharing among operators and with power and railway networks lowers costs
  • Concerns: Right of way delays by local bodies, cable cuts, power supply to towers and weak last-mile fibre
  • Way forward: Faster approvals, shared passive infrastructure and demand creation through useful digital services
  • Exam trap: The mission is under the Department of Telecommunications and is separate from the Digital India Corporation of MeitY

Why Does It Matter for the Exam?

  1. Launch: 17 December 2019
  2. Policy: National Digital Communications Policy, 2018
  3. NBM 2.0: Targets to 2030, fibre to 2.7 lakh villages and 100 Mbps
  4. Portal: Gati Shakti Sanchar for right of way
  5. Common errors: Giving MeitY as the agency or mixing NBM with BharatNet

As an analytical point, targets on fibre and speed matter only if people use broadband for work, learning and services. Reducing right of way costs and making content useful in local languages raise demand and make networks pay.

Why Is This Topic Important?

  • Dates 2019 and 2025
  • Targets 2030 figures
  • Policy base NDCP 2018

What Came Next?

The next topic covers the digital public infrastructure stack and the open commerce network. Next topic: India Stack and Open Network for Digital Commerce (ONDC).

Key People and Terms

  • NBM National Broadband Mission
  • NDCP National Digital Communications Policy
  • RoW Right of way
  • Anchor institutions Schools, health centres and panchayats
  • Mbps Megabits per second

Study this topic together with these linked topics from other subjects.

Exam Corner

Points to Remember

  • NBM launched: 17 December 2019.
  • NBM 2.0: 2025 to 2030.
  • Fibre: about 2.7 lakh villages.
  • Speed: 100 Mbps.
  • Policy: NDCP 2018.

Do Not Confuse With

  • NBM and BharatNet Policy mission versus a specific rural fibre project
  • NBM and the National Digital Communications Policy Mission versus the policy it implements
  • NBM and the Digital India Programme Telecom connectivity mission versus the larger digital programme

Memory Hook

Fibre to the village, fifty to a hundred Mbps, and clear right of way: the broadband mission.

Mains Angle

Questions ask how connectivity can be extended to all. These points give a balanced frame.

  • Strengths Clear targets, right of way reform and fibre mapping
  • Weaknesses Last-mile gaps and local delays
  • Way forward Shared infrastructure, demand creation and local language services

A Question You May Face

An original practice question, not a past paper question.

“Discuss the targets of the National Broadband Mission 2.0 and the policy reforms needed to meet them by 2030.”

How to Answer

  1. Introduce NBM and NBM 2.0.
  2. Targets Fibre, speed, institutions.
  3. Obstacles Right of way, last mile.
  4. Way Sharing and demand.

GS Relevance

Prelims: launch, policy link, 2030 targets, agency. GS Paper 3: infrastructure, telecom, digital connectivity. GS Paper 2: government policies, rural development.

Frequently Asked Questions

What is the National Broadband Mission?

The National Broadband Mission is an initiative of the Department of Telecommunications, launched on 17 December 2019, to speed up broadband access, especially in rural areas. National Broadband Mission 2.0, unveiled in January 2025 and effective from April 2025, sets targets to 2030, including fibre to about 2.7 lakh villages.

What are the targets of NBM 2.0?

NBM 2.0 aims by 2030 at fibre in about 2.7 lakh villages, broadband for 90 per cent of anchor institutions such as schools and health centres, an average fixed download speed of 100 Mbps, 60 rural internet subscribers per 100 people and clean power for 30 per cent of mobile towers.

Which ministry runs the National Broadband Mission?

The Department of Telecommunications in the Ministry of Communications runs the mission, with a Broadband Commission and a Project Management Unit. It works with States on right of way approvals through the Gati Shakti Sanchar portal, and it is separate from the Ministry of Electronics and Information Technology, which runs Digital India.

What is the National Digital Communications Policy 2018?

The National Digital Communications Policy 2018 replaced the National Telecom Policy of 2012. It set goals such as broadband at 50 Mbps for all, 1 crore public Wi-Fi hotspots by 2020, and 40 lakh additional jobs in the digital communications sector. The National Broadband Mission carries it out.

What is the latest status of the National Broadband Mission?

NBM 2.0 became effective on 1 April 2025 with targets to 2030. Progress figures such as fibre villages, institutions connected and speed come from the vision document and department statements and vary by date, so check the Department of Telecommunications for current data before quoting.

PYQ Practice — Statement Analysis

1 The National Broadband Mission was launched on 17 December 2019.
True

It is run by the Department of Telecommunications.

2 NBM is run by the Ministry of Electronics and Information Technology.
False

It is under the Ministry of Communications.

3 NBM 2.0 sets targets to 2030.
True

It includes a speed of 100 Mbps.

4 The National Digital Communications Policy was issued in 2018.
True

It replaced the National Telecom Policy.